| Construction
Page |
|
|

|
General Construction Policies
|
Checking
Grade
|
|
|
|
|
PAGE
OVERVIEW
|
|
|
|
Outside of our own construction projects that we have done
throughout the year, we also deal with a number of Engineering
firms, Developers, and Contractors that deal with both of
these. They are all required to design and install water
systems (which we will ultimately be inheriting) to our
standards. Below are links to our current Construction
Policies, and the Typical Installation Drawings that we
provide. All installation by a contractor outside of our
own crews will be overseen by a Clifton Water District
Inspector.
|
|
|
CURRENT
DOWNLOADS
|
|
|
|
|
Clifton
Water District distributes the current Construction
Policies using Adobe
Acrobat reader. The PDF format allows you to view our
downloadable documents electronically on most computers. The
free Adobe Acrobat reader is required to view and
print PDF files.
|
|
| |
|
| |
 |
|
|
|
In addition to our policies, we also offer our Typical
Construction Drawings for those individuals and entities that
have need of them. They are currently offered in AutoCad
2000, and AutoCad r14 formats. Please contact our IT
section via email, and they can attach a *.ZIP file that contains
them both when they reply.
Typical
Drawing 08 (pdf)
Typical
Drawing 09 (pdf)
At this time, direct download of these
AutoCad files
is not available. We want to keep track of who is
getting our drawing files.
|
|
|
|
|
| |
| |